Integrated Two-Phase Measurement Transformer / MRT TMEA11
Reduces the voltage and current of the medium voltage primary electrical network to values suitable for measurement by meters, relays or control circuits. It allows the measurement of energy on the medium voltage side of a transformer substation, to carry out energy balances, permanent own measurement (contrast with the monthly measurements of the electricity company) and temporary (monitor the rational use of electrical energy).